Republic of Korea
LG U+ Nonhyeon Center · 개소·일정
Operational · 2026-08-26
ASIA · KOREA DATA
각 숫자는 자료 유형별 기록 수입니다. 회사·시설 프로필을 독립 법인 수나 운영 중인 데이터센터 수로 합산하지 않습니다.
IT 부하 MW, 수전용량, 계약전력과 MVA는 각각의 지표입니다. 설계·목표 PUE와 실제 측정 PUE, 현재 정보와 과거 자료를 함께 확인하세요.
201–220번째 기록 · 11 / 17Page
Republic of Korea
Operational · 2026-08-26
Republic of Korea
Operations · 2026-08-26
Republic of Korea
This is LG Uplus’s second ultra-large-scale IDC, built following the Pyeongchon Mega Center. It is an operations center designed to meet corporate customers’ needs for cloud, AI, and big data. · 2026-08-26
Republic of Korea
Official documents highlight a Tier-IV-level redundant power and cooling configuration, outdoor air cooling, separation of office and data center buildings, and a five-tier security system as key features. However, since obtaining Tier-IV “certification” and having a Tier-IV-level facility configuration are not the same, the certification status must be verified separately. · 2026-08-26
Republic of Korea
Total floor area: 40,450 ㎡; 3 basement levels / 9 above-ground levels; over 200,000 servers · 2026-08-26
Republic of Korea
Disclosed capacity: not available · 2026-08-26
Republic of Korea
Completed in October 2023 · 2026-08-26
Republic of Korea
Operations · 2026-08-26
Republic of Korea
As a high-density commercial IDC in the Pyeongchon area of Anyang, it is a key hub with the largest publicly disclosed power capacity within LG Uplus’s official network of centers. · 2026-08-26
Republic of Korea
165 MW is the maximum power capacity that can be supplied by KEPCO and is not equivalent to the IT load. Official information states an average of 8 kW per rack, Tier III uptime design certification, and a configuration of two data centers. · 2026-08-26
Republic of Korea
Total floor area: 85,548 square meters; data center area: 8,400 pyeong · 2026-08-26
Republic of Korea
Power intake capacity: 165 MW · 2026-08-26
Republic of Korea
Operations began in 2015 · 2026-08-26
Republic of Korea
Operations · 2026-08-26
Republic of Korea
Located in the Digital Media City business district, this large-scale telecommunications IDC serves as a hub with strong accessibility for media and content companies and excellent telecommunications network connectivity. · 2026-08-26
Republic of Korea
On the same official page, the power capacity is listed differently as 19.25 MW (in the overview at the top) and 20 MW (in the detailed description). AI-DC KOREA does not arbitrarily consolidate these values but preserves them as discrepancies. · 2026-08-26
Republic of Korea
Total floor area: 58,744 m²; data center area: 2,100 pyeong · 2026-08-26
Republic of Korea
Official summary: 19.25 MW; detailed: 20 MW · 2026-08-26
Republic of Korea
Operational · 2026-08-26
Republic of Korea
Operations · 2026-08-26