시설 필드별 근거 332items

181–200번째 기록 · 10 / 17Page

대전권 기업·통신 수요를 담당하는 지역 거점. I checked the center names and locations on the official national IDC page. This is · 2026-08-26

While the existence and location of the operating centers have been officially confirmed, the power capacity, IT load, floor space, and year of opening have not been confirmed based solely on publicly available data. We will not display estimated values until additional data is confirmed. · 2026-08-26

Currently verifying the official network of data centers and conducting further research on facility specifications. · 2026-08-26

Operational · 2026-08-26

Operations · 2026-08-26

This is a large-scale urban IDC located in the heart of the Gasan Digital Complex. It serves as a hub for telecommunications and colocation services, equipped with dual power supplies and temperature and humidity control systems. · 2026-08-26

The gross floor area listed on the official website differs slightly: 75,000 m² in the detailed section and 75,040 m² in the summary. The 40 MW power rating refers to the power supply capacity and should be distinguished from the IT power available to customers. · 2026-08-26

Total floor area: Official figure 75,000 m²; summary 75,040 m² · 2026-08-26

Power reception capacity: 40 MW, 2 circuits · 2026-08-26

Operational · 2026-08-26

Operations · 2026-08-26

광주권 기업·통신 수요를 담당하는 지역 거점. I checked the center names and locations on the official national IDC page. This is · 2026-08-26

While the existence and location of the operating centers have been officially confirmed, the power capacity, IT load, floor space, and year of opening have not been confirmed based solely on publicly available data. We will not display estimated values until additional data is confirmed. · 2026-08-26

Currently verifying the official network of data centers and conducting further research on facility specifications. · 2026-08-26

Operational · 2026-08-26

Operations · 2026-08-26

This is an urban IDC located in the Gangnam IT business district. LG Uplus describes it as one of the largest centers among its IDCs in the Gangnam area. · 2026-08-26

Its strengths include accessibility to the city center and network demand in the Gangnam area. The official detailed figure of 28,059 m² and the summary figure of 28,000 m² appear to be due to rounding differences, so the detailed figure has been recorded as the primary value. · 2026-08-26

Total floor area: 28,059 ㎡; data center: 4,000 pyeong · 2026-08-26

Power reception capacity: 20 MW, 2 circuits · 2026-08-26

자료를 읽는 기준
  • 회사의 운영·개발·투자·소유·매입 역할을 구분하고, 확인된 연결 관계를 표시합니다.
  • 발표·계획·건설·운영 단계, 과거 자료와 현재 대표값 사용 여부를 각 기록에서 확인하세요.
  • IT 부하 MW, 수전용량, 계약전력과 MVA, 설계 PUE와 실측 PUE는 서로 다른 지표입니다.
  • 재무는 보고 법인·회계기간·통화·단위 배수·연결 또는 별도 범위를 함께 읽어야 합니다.
  • 문서는 공개 원문으로 연결합니다. 국가별 전력 통계는 발전량(TWh)·설비용량(GW)·에너지원·기간·빈도를 구분하며, 특정 센터의 공급 확정을 뜻하지 않습니다.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel