운영 상태 추가 확인
LG CNS 죽전데이터센터
233 Daejiro, Suji-gu, Yongin-si, Gyeonggi-do
Distinguish between power supply, UPS, and IT load
MSP, Cloud, Commercial
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
LG CNS 공식 운영망에 포함된 용인권 데이터센터입니다. 운영사 공식자료에서 센터망 편입을 확인했습니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
센터 존재와 운영주체는 공식 확인했지만 수전용량·UPS·IT Load·상면은 공개 원문만으로 확정하지 않았습니다. 공개되지 않은 전력 수치는 추정하지 않습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
