Operational
KT Cloud Beomil Data Center
Beomil-dong, Dong-gu, Busan Metropolitan City
Distinguish between power supply, UPS, and IT load
Regional Hubs and Telecommunications
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
공식 고객지원 연락망에서 운영이 확인되는 부산권 센터. We confirmed the center name and role on the kt cloud official center network.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
Although the inclusion in the operational network has been officially confirmed, we are currently cross-checking the detailed road addresses, power capacity, IT load, and number of racks against the original documents and administrative data for each center. Unconfirmed figures are not displayed.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
