Total incoming and facility power설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

완주 테크노그린 AI 데이터센터 · Plan

Plan
Select a topic to explore
완주 테크노그린 AI 데이터센터: schematic of development scale. Does not reproduce the actual layout or site boundaries.Building dimensions · Development StageConceptual Diagram · 실배치 아님01최고Unverified대지 면적 미확인Plan
Currently documented project stagePlan

Permit, construction and use-approval milestones reflect the scope of each documented record.

Last reviewed 2026-11-20Planned specifications · Separate from completed construction

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Plan · 설계·협약 단계 · 가동일 미확인

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
테크노그린 (개발)
Facility type
AI 데이터센터 개발계획
Building and facility size
Unverified
Verify data
2026-11-20

Loading project participants…

FACILITY PROFILE

About this data center

전북 완주 · AI 데이터센터 개발계획

Some original descriptions below are in Korean. Request an English review of this facility →

테크노그린이 완주군 봉동읍 장구리에 추진하는 모듈형 AI 데이터센터 계획이다. 2026년10월 공개 설계의 전력·IT 용량은 설치·운영 완료 수치가 아니다.

  • 01설계·협약 단계 · 가동일 미확인
  • 02설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.

LOCATION & ACCESS

Location and surrounding area

상세주소 확인

Detailed location under review

Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.

Public address전북특별자치도 완주군 봉동읍 장구리 578-6

The facility location will be shown once further information is available.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
테크노그린 (개발)
Facility type
AI 데이터센터 개발계획
Building and facility size
Unverified
Public Power
설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.
Project Phases
Plan
Opening and announced dates
설계·협약 단계 · 가동일 미확인
How to interpret the specifications

설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Plan · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
설계·협약 단계 · 가동일 미확인

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 2records · latest check 2026-11-20

  1. 01
    Project | 전북 완주 AI 데이터센터 ↗

    테크노그린

    Source reference date Not stated · Observed 2026-11-20

  2. 02
    완주군에 전북 최초 2,800억 규모 데이터센터 들어선다 ↗

    완주군

    Source reference date 2026-02-26 · Observed 2026-11-20

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel