완주 테크노그린 AI 데이터센터
전북특별자치도 완주군 봉동읍 장구리 578-6
Public source documents 2 · Last reviewed 2026-11-20
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
완주 테크노그린 AI 데이터센터 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 설계·협약 단계 · 가동일 미확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 테크노그린 (개발)
- Facility type
- AI 데이터센터 개발계획
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
전북 완주 · AI 데이터센터 개발계획Some original descriptions below are in Korean. Request an English review of this facility →
테크노그린이 완주군 봉동읍 장구리에 추진하는 모듈형 AI 데이터센터 계획이다. 2026년10월 공개 설계의 전력·IT 용량은 설치·운영 완료 수치가 아니다.
- 01설계·협약 단계 · 가동일 미확인
- 02설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.
LOCATION & ACCESS
Location and surrounding area
상세주소 확인
Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.
The facility location will be shown once further information is available.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 테크노그린 (개발)
- Facility type
- AI 데이터센터 개발계획
- Building and facility size
- Unverified
- Public Power
- 설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.
- Project Phases
- Plan
- Opening and announced dates
- 설계·협약 단계 · 가동일 미확인
How to interpret the specifications
설계수전20MW·설계 IT15.4MW·단계별 최대40MW 확장계획. 계약·통전은 미확인.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 설계·협약 단계 · 가동일 미확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 2records · latest check 2026-11-20
- 01
- 02
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.