포천 지엔비 데이터센터 계획
경기도 포천시 신북면 에코그린일반산업단지
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
포천 지엔비 데이터센터 계획 · Licensing Complete
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Licensing Complete · 2026년 상반기 착공 목표(2025년 발표) · 실제 착공 미확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 지엔비데이터센터(개발·운영 예정)
- Facility type
- 데이터센터 개발사업
- Building and facility size
- 개별: 부지·건축규모 미공 items
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
경기 포천 · 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
포천시가 2025년 11월 부지매입과 건축허가 완료를 발표한 지엔비 데이터센터 사업입니다.
- 01부지매입·건축허가 완료 발표
- 02전력절차와 공급개시 구분
LOCATION & ACCESS
Location and surrounding area
사업구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 지엔비데이터센터(개발·운영 예정)
- Facility type
- 데이터센터 개발사업
- Building and facility size
- 개별: 부지·건축규모 미공 items
- Public Power
- 전력공급: 절차 일부 완료 발표 · 수전·IT·계약 용량 미공 items
- Project Phases
- Licensing Complete
- Opening and announced dates
- 2026년 상반기 착공 목표(2025년 발표) · 실제 착공 미확인
How to interpret the specifications
공식자료는 전력공급 절차 일부 완료와 이후 착공목표를 제시합니다. 목표일 경과를 실제 착공 또는 전력공급 개시로 해석하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Licensing Complete · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년 상반기 착공 목표(2025년 발표) · 실제 착공 미확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.