● Under constructionAI 데이터센터 개발사업

장성 파인 데이터센터

전남광주통합특별시 장성군 남면 삼태리 412-17 (광주연구개발특구 첨단3지구 연구3BL)

Public source documents 6 · Last reviewed 2026-11-20

Total incoming and facility power초기 단계 26MW 개발계획(2025-12 지자체 발표). 실제 통전·운영전력은 미확인.

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

장성 파인 데이터센터 · Under construction

Under construction
Select a topic to explore
장성 파인 데이터센터: schematic of development scale. Does not reproduce the actual layout or site boundaries.Building dimensions · Development StageConceptual Diagram · 실배치 아님01최고Unverified대지 면적 미확인Under construction
Currently documented project stageUnder construction

Permit, construction and use-approval milestones reflect the scope of each documented record.

Last reviewed 2026-11-20Planned specifications · Separate from completed construction

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Under construction · 2025년 12월 착공 발표 · Under construction

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
파인디씨피에프브이 (시행)
Facility type
AI 데이터센터 개발사업
Building and facility size
Unverified
Verify data
2026-11-20

Loading project participants…

FACILITY PROFILE

About this data center

전남 장성 · AI 데이터센터 개발사업

Some original descriptions below are in Korean. Request an English review of this facility →

장성군 남면 삼태리에 조성하는 파인 데이터센터다. 파인디씨피에프브이가 시행하며, 확보된 자료상 공사가 진행 중이다.

  • 012025년 12월 착공 발표 · Under construction
  • 02초기 단계 26MW 개발계획(2025-12 지자체 발표). 실제 통전·운영전력은 미확인.

LOCATION & ACCESS

Location and surrounding area

상세주소 확인 · 투자자가 공개한 대표지번과 시공사 사업 블록. 준공 도로명은 미확인.

Detailed location under review

Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.

Public address전남광주통합특별시 장성군 남면 삼태리 412-17 (광주연구개발특구 첨단3지구 연구3BL)

The facility location will be shown once further information is available.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
파인디씨피에프브이 (시행)
Facility type
AI 데이터센터 개발사업
Building and facility size
Unverified
Public Power
초기 단계 26MW 개발계획(2025-12 지자체 발표). 실제 통전·운영전력은 미확인.
Project Phases
Under construction
Opening and announced dates
2025년 12월 착공 발표 · Under construction
How to interpret the specifications

투자자가 공개한 대표지번과 시공사 사업 블록. 준공 도로명은 미확인. 초기 단계 26MW 개발계획(2025-12 지자체 발표). 실제 통전·운영전력은 미확인.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Under construction · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
2025년 12월 착공 발표 · Under construction

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 6records · latest check 2026-11-20

  1. 01
    장성 파인 데이터센터 수주 ↗

    대우건설

    Source reference date Not stated · Observed 2026-11-20

  2. 02
    장성파인데이터센터 사업계획 ↗

    장성군

    Source reference date 2025-06-17 · Observed 2026-11-20

  3. 03
    장성파인데이터센터48억출자계획 ↗

    광주MBC

    Source reference date 2026-10-06 · Observed 2026-11-20

  4. 04
    전남1호 장성파인데이터센터 착공 ↗

    South Jeolla Province

    Source reference date 2025-12-15 · Observed 2026-11-20

  5. 05
    전남광주통합특별시 출범과 주소 체계 ↗

    대한민국 정책주간지 K-공감

    Source reference date Not stated · Observed 2026-11-20

  6. 06
    파인 데이터센터 투자자산 ↗

    KB발해인프라투융자회사

    Source reference date Not stated · Observed 2026-11-20

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel