Data Center Database/LG Uplus/Paju, Gyeonggi Province
● Under constructionAI data center campus

LG Uplus Paju AI Data Center Campus

Paju, Gyeonggi-do (exact address unverified)

공개 원문 1건 · 자료 최근 확인 2026-11-06

Total incoming and facility power200MW total utility-intake capacity; IT load and UPS undisclosed

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Under construction · Building 1 to operate after June 2027 completion; phased campus opening planned by 2028

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
LG Uplus
Facility type
AI data center campus
Building and facility size
Four buildings in total
Verify data
2026-11-06

Loading project participants…

FACILITY PROFILE

이 데이터센터를 소개합니다.

Paju, Gyeonggi Province · AI data center campus

This covers the whole campus; Building 1's announced scale is 50MW.

  • 01Whole-campus scope with separate building phases

LOCATION & ACCESS

위치와 주변 지도를 확인하세요.

상세 위치 확인 중

검증된 시설 좌표가 아직 없습니다.
아래 지도에서 공개된 주소 또는 센터명을 검색할 수 있습니다.

공개 소재 정보Paju, Gyeonggi-do (exact address unverified)

시설 위치는 추가 자료 확인 후 표시합니다.

FACILITIES & SERVICES

시설과 운영 특성

센터별 공개자료를 기준으로 정리했습니다.
Operating and Development Entities
LG Uplus
Facility type
AI data center campus
Building and facility size
Four buildings in total
Public Power
200MW total utility-intake capacity; IT load and UPS undisclosed
Project Phases
Under construction
개관·공개 일정
Building 1 to operate after June 2027 completion; phased campus opening planned by 2028
시설 제원 해석과 검토 사항

Dates are targets. IT load, leasable power, exact address, main contractor and designer are unverified.

수전용량·UPS 용량·IT Load는 서로 다른 지표입니다. 총 시설용량과 현재 입주 가능한 잔여용량도 구분합니다.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Under construction · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
Building 1 to operate after June 2027 completion; phased campus opening planned by 2028

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

자료 출처와 확인일

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 1records · latest check 2026-11-06

  1. 01
    Paju AIDC phased operating plan ↗

    LG Uplus

    Source reference date Not stated · Observed 2026-11-06

전력·면적·냉각·인증 정보는 공개된 범위만 제공합니다. 입주 가능 용량·임대료·계약조건은 운영사 확인 후 안내합니다.

이 센터 정보 정정·자료 제공 →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel