Separate from IT, UPS and standby power
코리아플랜 천안 CDC 캠퍼스
충청남도 천안시 동남구 성남면 용원리 509-2 외 19필지(A)·산99 외 16필지(B)
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
코리아플랜 천안 CDC 캠퍼스 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 개발·설계계획·사업자 전력계약 발표
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 코리아플랜(개발)
- Facility type
- 복수 부지 데이터센터 개발사업
- Building and facility size
- A 42,842.7㎡·B 42,788.9㎡, 설계 연면적 합계 85,631.6㎡
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Cheonan, South Chungcheong Province · 복수 부지 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
천안시 성남면 용원리의 A·B 부지를 함께 개발하는 코리아플랜 CDC 사업입니다. 사업자는 각 부지에 40MW 규모 데이터센터를 계획하고 전체 부지 매입과 공동 전력계약 체결을 안내합니다.
- 01A·B 부지 통합 사업 조회
- 02상용·예비 전력 분리
- 03현재 설계와 허가도서 범위 구분
LOCATION & ACCESS
Location and surrounding area
상세주소 확인 · A·B 두 부지의 공동 개발사업입니다. 각 부지 위치와 사업 전체 범위를 구분합니다.
Location obtained by geocoding the published address.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 코리아플랜(개발)
- Facility type
- 복수 부지 데이터센터 개발사업
- Building and facility size
- A 42,842.7㎡·B 42,788.9㎡, 설계 연면적 합계 85,631.6㎡
- Public Power
- A·B 각 40MW 계획. 사업자 발표: 공동 상용 80MW·예비 80MW 계약, 154kV 연계. 예비전력을 추가 사용용량으로 합산하지 않으며 실제 공급개시는 미확인.
- Project Phases
- Plan
- Opening and announced dates
- 개발·설계계획·사업자 전력계약 발표
How to interpret the specifications
A부지는 용원리 509-2 외 19필지, B부지는 산99 외 16필지입니다. 공동 상용 80MW와 예비 80MW를 별도로 표시하고, 두 부지에 같은 계약 총량을 각각 더하지 않습니다. 인입 경로와 공급개시는 사업자 설명 외 공급기관 원문 확인이 필요합니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 개발·설계계획·사업자 전력계약 발표
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.