Separate from IT, UPS and standby power
KAIST AI-Science 데이터센터 신축계획
대전광역시 유성구 KAIST 대전 본원 캠퍼스(세부 부지 미확인)
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
KAIST AI-Science 데이터센터 신축계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2026년 8월 신축 설계공모 관련 공고 확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- KAIST(발주·구축)
- Facility type
- 대학·AI 연구 데이터센터 신축사업
- Building and facility size
- 설계공모 단계·건축 규모 추가 확인
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
대전 유성 · 대학·AI 연구 데이터센터 신축사업Some original descriptions below are in Korean. Request an English review of this facility →
KAIST가 추진하는 AI-Science 데이터센터 신축사업입니다. 2026년 8월 18일 공식 설계공모 심사위원 변경공고에서 사업의 설계공모 진행을 확인했습니다.
- 01대학·AI 연구시설 신축
- 02공식 설계공모 확인
- 03세부 부지·전력 추가 확인
LOCATION & ACCESS
Location and surrounding area
건물·캠퍼스 확인 · 대학 캠퍼스와 신축 건물 위치를 구분합니다. 상세 필지와 시설 좌표는 추가 확인이 필요합니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- KAIST(발주·구축)
- Facility type
- 대학·AI 연구 데이터센터 신축사업
- Building and facility size
- 설계공모 단계·건축 규모 추가 확인
- Public Power
- 수전·IT·계약전력: 미공 items
- Project Phases
- Plan
- Opening and announced dates
- 2026년 8월 신축 설계공모 관련 공고 확인
How to interpret the specifications
대학의 연구 인프라 구축계획으로 분류합니다. 캠퍼스 대표주소를 신축 건물의 확정 위치로 사용하지 않으며, 전력 용량과 착공·가동 시점은 추가 자료로 확인합니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년 8월 신축 설계공모 관련 공고 확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.