● PlanAI 데이터센터 개발사업

장성 황룡면 디에느·에이파사드 AI 데이터센터 계획

전남광주통합특별시 장성군 황룡면 월평리 일원

Public source documents 1 · Last reviewed 2026-11-21

Total incoming and facility power2동 합계 10MW 계획. 수전·IT 지표와 공급계약은 미확인.

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

장성 황룡면 디에느·에이파사드 AI 데이터센터 계획 · Plan

Plan
Select a topic to explore
장성 황룡면 디에느·에이파사드 AI 데이터센터 계획: schematic of development scale. Does not reproduce the actual layout or site boundaries.Building dimensions · Development StageConceptual Diagram · 실배치 아님01최고Unverified대지 3,440 ㎡Plan
Currently documented project stagePlan

Permit, construction and use-approval milestones reflect the scope of each documented record.

Last reviewed 2026-11-21Planned specifications · Separate from completed construction

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Plan · 2026년 6월 건축허가 사항 부서 보고 확인

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
디에느·에이파사드(시행)
Facility type
AI 데이터센터 개발사업
Building and facility size
대지 3,440㎡·지상 1층 건물 2동 계획
Verify data
2026-11-21

Loading project participants…

FACILITY PROFILE

About this data center

전남 장성 · AI 데이터센터 개발사업

Some original descriptions below are in Korean. Request an English review of this facility →

디에느와 에이파사드가 황룡면 월평리 일원에서 추진하는 AI 데이터센터 사업입니다. 장성군은 3,440㎡ 부지의 단층 건물 2동과 전체 10MW 규모를 설명했습니다.

  • 012동 합계 10MW 계획
  • 02시행사·사업구역 확인
  • 03개별 필지 추가 대조

LOCATION & ACCESS

Location and surrounding area

사업구역 확인 · 공식 발표는 월평리 일원까지 확인됩니다. 두 건물의 개별 필지는 원 허가자료 대조가 필요합니다.

Location area · indicative position
Loading the location map
The dashed circle is a reference for the recorded area.
Published location전남광주통합특별시 장성군 황룡면 월평리 일원

The map shows the area center. The facility address and site boundary are not confirmed.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
디에느·에이파사드(시행)
Facility type
AI 데이터센터 개발사업
Building and facility size
대지 3,440㎡·지상 1층 건물 2동 계획
Public Power
2동 합계 10MW 계획. 수전·IT 지표와 공급계약은 미확인.
Project Phases
Plan
Opening and announced dates
2026년 6월 건축허가 사항 부서 보고 확인
How to interpret the specifications

인근 베네포스장성디씨의 200MW급 사업과 분리해 조회합니다. 10MW는 두 동의 사업 전체 계획이며 동별 10MW 또는 실제 계약전력으로 해석하지 않습니다.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Plan · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
2026년 6월 건축허가 사항 부서 보고 확인

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 1records · latest check 2026-11-21

  1. 01
    황룡면 AI 데이터센터 건축허가 사항·사업 개요 ↗

    장성군

    Source reference date 2026-06-16 · Observed 2026-11-21

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel