장성 황룡면 디에느·에이파사드 AI 데이터센터 계획
전남광주통합특별시 장성군 황룡면 월평리 일원
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
장성 황룡면 디에느·에이파사드 AI 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2026년 6월 건축허가 사항 부서 보고 확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 디에느·에이파사드(시행)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- 대지 3,440㎡·지상 1층 건물 2동 계획
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
전남 장성 · AI 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
디에느와 에이파사드가 황룡면 월평리 일원에서 추진하는 AI 데이터센터 사업입니다. 장성군은 3,440㎡ 부지의 단층 건물 2동과 전체 10MW 규모를 설명했습니다.
- 012동 합계 10MW 계획
- 02시행사·사업구역 확인
- 03개별 필지 추가 대조
LOCATION & ACCESS
Location and surrounding area
사업구역 확인 · 공식 발표는 월평리 일원까지 확인됩니다. 두 건물의 개별 필지는 원 허가자료 대조가 필요합니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 디에느·에이파사드(시행)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- 대지 3,440㎡·지상 1층 건물 2동 계획
- Public Power
- 2동 합계 10MW 계획. 수전·IT 지표와 공급계약은 미확인.
- Project Phases
- Plan
- Opening and announced dates
- 2026년 6월 건축허가 사항 부서 보고 확인
How to interpret the specifications
인근 베네포스장성디씨의 200MW급 사업과 분리해 조회합니다. 10MW는 두 동의 사업 전체 계획이며 동별 10MW 또는 실제 계약전력으로 해석하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년 6월 건축허가 사항 부서 보고 확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.