Separate from IT, UPS and standby power
인우버스 AI 대구 데이터센터(AIDDC·영천)
경상북도 영천시 금호읍 남성리 485 일원
Public source documents 3 · Last reviewed 2026-11-20
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
인우버스 AI 대구 데이터센터(AIDDC·영천) · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 사업부지 매매계약 발표·인허가 및 전력연계 준비
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 인우버스(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
경북 영천 · AI 데이터센터 개발사업Some original descriptions below are in Korean. Request an English review of this facility →
인우버스가 경북 영천시 금호읍 남성리에 추진하는 AI 데이터센터 개발계획이다. 사업명에는 대구가 포함되지만 실제 사업지는 영천이다.
- 01사업부지 매매계약 발표·인허가 및 전력연계 준비
- 02사업자 설계 계획: 수전150MW·IT100MW(전력연계·공급계약 미확인)
LOCATION & ACCESS
Location and surrounding area
상세주소 확인 / 대표 지번
Location obtained by geocoding the published address.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 인우버스(개발)
- Facility type
- AI 데이터센터 개발사업
- Building and facility size
- Unverified
- Public Power
- 사업자 설계 계획: 수전150MW·IT100MW(전력연계·공급계약 미확인)
- Project Phases
- Plan
- Opening and announced dates
- 사업부지 매매계약 발표·인허가 및 전력연계 준비
How to interpret the specifications
공개 개발자료의 계획값입니다. 전기사용계약·실제 통전·현재 가동 용량으로 분류하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 사업부지 매매계약 발표·인허가 및 전력연계 준비
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 3records · latest check 2026-11-20
- 01
- 02Inuverse·FuelCell Energy AI 데이터센터 전략적 제휴 ↗
인우버스
Source reference date Not stated · Observed 2026-11-20
- 03
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.