HJ중공업 북항IDC PFV 데이터센터 계획
인천광역시 서해구 원창동 522-1 외 13필지
Public source documents 4 · Last reviewed 2026-11-20
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
HJ중공업 북항IDC PFV 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 개발계획 단계 · 본공사 착수 미확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 북항아이디씨피에프브이 (시행)
- Facility type
- 데이터센터 개발계획
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
인천 서해 · 데이터센터 개발계획Some original descriptions below are in Korean. Request an English review of this facility →
북항아이디씨피에프브이가 인천 원창동522-1 일원에서 추진하는 데이터센터 개발계획이다. 원창동381-73 일원의 청라 IDC와는 별도 부지·사업주체다.
- 01개발계획 단계 · 본공사 착수 미확인
- 02120MW급 개발계획 보도(2026-07). 수전·IT 구분 및 전기사용계약은 미확인.
LOCATION & ACCESS
Location and surrounding area
상세주소 확인 · 대표필지 외 13필지의 개별 지번은 미확인. 청라 IDC의 원창동381-73·381-74와 다른 사업부지다.
Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.
The facility location will be shown once further information is available.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 북항아이디씨피에프브이 (시행)
- Facility type
- 데이터센터 개발계획
- Building and facility size
- Unverified
- Public Power
- 120MW급 개발계획 보도(2026-07). 수전·IT 구분 및 전기사용계약은 미확인.
- Project Phases
- Plan
- Opening and announced dates
- 개발계획 단계 · 본공사 착수 미확인
How to interpret the specifications
대표필지 외 13필지의 개별 지번은 미확인. 청라 IDC의 원창동381-73·381-74와 다른 사업부지다. 120MW급 개발계획 보도(2026-07). 수전·IT 구분 및 전기사용계약은 미확인.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 개발계획 단계 · 본공사 착수 미확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 4records · latest check 2026-11-20
- 01
- 02
- 03
- 04
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.