● Plan계획 단계 상업용 데이터센터

GMS 부산 에코델타 데이터센터 계획

부산광역시 강서구 에코델타시티 그린데이터센터 집적단지

Public source documents 1 · Last reviewed 2026-11-21

Total incoming and facility power개별: 수전·IT 부하·전력계약 용량 미공 items

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

GMS 부산 에코델타 데이터센터 계획 · Plan

Plan
Select a topic to explore
GMS 부산 에코델타 데이터센터 계획: schematic of development scale. Does not reproduce the actual layout or site boundaries.Building dimensions · Development StageConceptual Diagram · 실배치 아님01최고Unverified대지 면적 미확인Plan
Currently documented project stagePlan

Permit, construction and use-approval milestones reflect the scope of each documented record.

Last reviewed 2026-11-21Planned specifications · Separate from completed construction

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Plan · 개별: 착공·개소 일정 미공 items

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
부산GMS에코델타DC 컨소시엄(선정사업자)
Facility type
계획 단계 상업용 데이터센터
Building and facility size
개별: 부지·건축규모 미공 items
Verify data
2026-11-21

Loading project participants…

FACILITY PROFILE

About this data center

Gangseo, Busan · 계획 단계 상업용 데이터센터

Some original descriptions below are in Korean. Request an English review of this facility →

부산시가 입주사업자로 선정한 GMS 에코델타 데이터센터 계획입니다.

  • 012024년 3월 발표 당시 투자협약 예정
  • 02개별 사업으로 구분

LOCATION & ACCESS

Location and surrounding area

사업구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.

Location area · indicative position
Loading the location map
The dashed circle is a reference for the recorded area.
Published location부산광역시 강서구 에코델타시티 그린데이터센터 집적단지

The map shows the area center. The facility address and site boundary are not confirmed.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
부산GMS에코델타DC 컨소시엄(선정사업자)
Facility type
계획 단계 상업용 데이터센터
Building and facility size
개별: 부지·건축규모 미공 items
Public Power
개별: 수전·IT 부하·전력계약 용량 미공 items
Project Phases
Plan
Opening and announced dates
개별: 착공·개소 일정 미공 items
How to interpret the specifications

입주사업자 선정은 확인되지만 2024년 3월 발표에서 GMS의 투자협약은 향후 체결로 안내됐습니다. 후속 협약·착공 여부는 미확인입니다.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Plan · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
개별: 착공·개소 일정 미공 items

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 1records · latest check 2026-11-21

  1. 01
    에코델타시티 입주5개사 선정 및 협약 현황 ↗

    Busan Metropolitan City

    Source reference date 2024-03-04 · Observed 2026-11-21

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel