GMS 부산 에코델타 데이터센터 계획
부산광역시 강서구 에코델타시티 그린데이터센터 집적단지
Public source documents 1 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
GMS 부산 에코델타 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 개별: 착공·개소 일정 미공 items
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 부산GMS에코델타DC 컨소시엄(선정사업자)
- Facility type
- 계획 단계 상업용 데이터센터
- Building and facility size
- 개별: 부지·건축규모 미공 items
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Gangseo, Busan · 계획 단계 상업용 데이터센터Some original descriptions below are in Korean. Request an English review of this facility →
부산시가 입주사업자로 선정한 GMS 에코델타 데이터센터 계획입니다.
- 012024년 3월 발표 당시 투자협약 예정
- 02개별 사업으로 구분
LOCATION & ACCESS
Location and surrounding area
사업구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 부산GMS에코델타DC 컨소시엄(선정사업자)
- Facility type
- 계획 단계 상업용 데이터센터
- Building and facility size
- 개별: 부지·건축규모 미공 items
- Public Power
- 개별: 수전·IT 부하·전력계약 용량 미공 items
- Project Phases
- Plan
- Opening and announced dates
- 개별: 착공·개소 일정 미공 items
How to interpret the specifications
입주사업자 선정은 확인되지만 2024년 3월 발표에서 GMS의 투자협약은 향후 체결로 안내됐습니다. 후속 협약·착공 여부는 미확인입니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 개별: 착공·개소 일정 미공 items
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-21
- 01에코델타시티 입주5개사 선정 및 협약 현황 ↗
Busan Metropolitan City
Source reference date 2024-03-04 · Observed 2026-11-21
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.