● OperationsAI 클라우드·코로케이션

DCP 강남 AI Cloud Center

서울특별시 강남구 도산대로 220, 엠포리아빌딩 B2·3~5층

Public source documents 1 · Last reviewed 2026-11-20

Total incoming and facility power전력 제원 대조 필요

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

DCP 강남 AI Cloud Center · Operations

Operations
Select a topic to explore
DCP 강남 AI Cloud Center: schematic of facility systems. Shows relationships among published specifications, not actual layouts or equipment counts.Power · Cooling · ServersSchematic Cooling flow Power supplyIncoming feeds Cooling equipmentSpecifications unconfirmed Server equipmentConceptual layout Power · Cooling · Servers
IT LoadUnverified
Supported power per rackUnverified
Cooling technologyUnverified
Last reviewed 2026-11-20Facility specifications · Separate from current availability

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Operations · 2026년9월 공식 회사소개서의 운영시설 기록

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
DCP(운영)
Facility type
AI 클라우드·코로케이션
Building and facility size
Unverified
Verify data
2026-11-20

Loading project participants…

FACILITY PROFILE

About this data center

Gangnam, Seoul · AI 클라우드·코로케이션

Some original descriptions below are in Korean. Request an English review of this facility →

서울 강남구 도산대로220 엠포리아빌딩 일부층에서 운영하는 DCP의 AI 클라우드센터다.

  • 012026년9월 공식 회사소개서의 운영시설 기록
  • 02전력 제원 대조 필요

LOCATION & ACCESS

Location and surrounding area

상세주소 확인

Detailed location under review

Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.

Public address서울특별시 강남구 도산대로 220, 엠포리아빌딩 B2·3~5층

The facility location will be shown once further information is available.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
DCP(운영)
Facility type
AI 클라우드·코로케이션
Building and facility size
Unverified
Public Power
전력 제원 대조 필요
Project Phases
Operations
Opening and announced dates
2026년9월 공식 회사소개서의 운영시설 기록
How to interpret the specifications

공식 회사소개서의 2026년 9월 운영시설 기록을 바탕으로 정리했습니다. 공식 회사소개서와 웹페이지의 전력 제원이 상충해 수치는 대조 후 표시합니다.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Operations · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
2026년9월 공식 회사소개서의 운영시설 기록

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 1records · latest check 2026-11-20

  1. 01
    DCK Company Introduction 2026-09-11 v4.5 ↗

    DCK

    Source reference date 2026-09-11 · Observed 2026-11-20

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel