Separate from IT, UPS and standby power
DCP 강남 AI Cloud Center
서울특별시 강남구 도산대로 220, 엠포리아빌딩 B2·3~5층
Public source documents 1 · Last reviewed 2026-11-20
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
DCP 강남 AI Cloud Center · Operations
Current status
Current facility status and operating features
Operations · 2026년9월 공식 회사소개서의 운영시설 기록
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- DCP(운영)
- Facility type
- AI 클라우드·코로케이션
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
Gangnam, Seoul · AI 클라우드·코로케이션Some original descriptions below are in Korean. Request an English review of this facility →
서울 강남구 도산대로220 엠포리아빌딩 일부층에서 운영하는 DCP의 AI 클라우드센터다.
- 012026년9월 공식 회사소개서의 운영시설 기록
- 02전력 제원 대조 필요
LOCATION & ACCESS
Location and surrounding area
상세주소 확인
Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.
The facility location will be shown once further information is available.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- DCP(운영)
- Facility type
- AI 클라우드·코로케이션
- Building and facility size
- Unverified
- Public Power
- 전력 제원 대조 필요
- Project Phases
- Operations
- Opening and announced dates
- 2026년9월 공식 회사소개서의 운영시설 기록
How to interpret the specifications
공식 회사소개서의 2026년 9월 운영시설 기록을 바탕으로 정리했습니다. 공식 회사소개서와 웹페이지의 전력 제원이 상충해 수치는 대조 후 표시합니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Operations · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2026년9월 공식 회사소개서의 운영시설 기록
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 1records · latest check 2026-11-20
- 01
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.