Separate from IT, UPS and standby power
DCI SEL01 가산 데이터센터
서울특별시 금천구 가산동 459-2
Public source documents 4 · Last reviewed 2026-11-20
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
DCI SEL01 가산 데이터센터 · Completed · operation not confirmed
Current status
Current facility status and operating features
Completed · operation not confirmed · 준공 확인·상업가동일 미확인
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- DCI Data Centers·대림(개발)
- Facility type
- Commercial Data Centers
- Building and facility size
- Unverified
- Verify data
- 2026-11-20
Loading project participants…
FACILITY PROFILE
About this data center
Geumcheon, Seoul · Commercial Data CentersSome original descriptions below are in Korean. Request an English review of this facility →
DCI Data Centers와 대림이 개발한 서울 금천구 가산동 데이터센터입니다. 준공 상태의 사업이며 정확한 상업가동 개시일은 미확인입니다.
- 01준공 확인·상업가동일 미확인
- 02수전·IT·계약전력 미확인
LOCATION & ACCESS
Location and surrounding area
상세주소 확인
Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.
The facility location will be shown once further information is available.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- DCI Data Centers·대림(개발)
- Facility type
- Commercial Data Centers
- Building and facility size
- Unverified
- Public Power
- 수전·IT·계약전력 미확인
- Project Phases
- Completed · operation not confirmed
- Opening and announced dates
- 준공 확인·상업가동일 미확인
How to interpret the specifications
공개자료의 사업 단계와 주소를 정리했습니다. 실제 가동 여부와 전력 제원은 확인된 범위만 표시합니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Completed · operation not confirmed · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 준공 확인·상업가동일 미확인
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 4records · latest check 2026-11-20
- 01DCI commences flagship South Korean Data Center ↗
DCI Data Centers
Source reference date Not stated · Observed 2026-11-20
- 02
- 03
- 04
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.