Bush Estate Edinburgh - Project Progression
接続登録 · built
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| MW Connected | 2.5 MW | 原出典の列定義 · project stage · Built 基準日 2026-10-01 根拠 EV-31ba1f84864c78deeb2c7a99 |
| MW Increase / Decrease | 0 MW | 原出典の列定義 · project stage · Built 基準日 2026-10-01 根拠 EV-31ba1f84864c78deeb2c7a99 |
| Cumulative Total Capacity (MW) | 2.5 MW | 原出典の列定義 · project stage · Built 基準日 2026-10-01 根拠 EV-31ba1f84864c78deeb2c7a99 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Project Name | Bush Estate Edinburgh - Project Progression |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | Burdiehouse BESS 275kV Substation |
| Stage | 未取得 |
| MW Connected | 2.50 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 2.50 |
| MW Effective From | 未取得 |
| Project Status | Built |
| HOST TO | SPT |
| Plant Type | CHP (Combined Heat and Power);PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005ivXQAQ |
| Project Number | PRO-002279 |
| Gate | 未取得 |
| 原文の状態 | Built |
| source_record_id | csv:row:103 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-10-01 ・取得確認 2026-10-05
Supported by National Energy SO Open Data
原文内の位置 csv:row:103
根拠 EV-31ba1f84864c78deeb2c7a99資料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 59f79cd0e5735ba1b78e9b5850c71e8347e33c2bac08f850ba228e2438644c56