Pointe Coupee Power Station / PC2A
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 469.3 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-baf7d48a8130f0ad8167fe19 |
| Net Summer Capacity (MW) | 435.4 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-baf7d48a8130f0ad8167fe19 |
| Net Winter Capacity (MW) | 469.3 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-baf7d48a8130f0ad8167fe19 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69944 |
| Plant Name | Pointe Coupee Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Pointe Coupee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | PC2A |
| Unit Code | PC02 |
| Nameplate Capacity (MW) | 469.3 |
| Net Summer Capacity (MW) | 435.4 |
| Net Winter Capacity (MW) | 469.3 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 11 |
| Planned Operation Year | 2031 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.739 |
| Longitude | -91.377 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2293 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:2469
根拠 EV-08b51b83b5b59f6cba8aa48e資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ce3ec56fa4a5e1a34bdd4588498f510f93f5e3d6e94452012f327b90ed974dff
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:2293
根拠 EV-baf7d48a8130f0ad8167fe19資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5c91fdcf319fafd625691424d6ec2039c53b48eb348d1b5930588d1b11d86ae9