| Nameplate Capacity (MW) | 469.3 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-baf7d48a8130f0ad8167fe19 |
| Net Summer Capacity (MW) | 435.4 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-baf7d48a8130f0ad8167fe19 |
| Net Winter Capacity (MW) | 469.3 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-baf7d48a8130f0ad8167fe19 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69944 |
| Plant Name | Pointe Coupee Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Pointe Coupee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | PC2A |
| Unit Code | PC02 |
| Nameplate Capacity (MW) | 469.3 |
| Net Summer Capacity (MW) | 435.4 |
| Net Winter Capacity (MW) | 469.3 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 11 |
| Planned Operation Year | 2031 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.739 |
| Longitude | -91.377 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2293 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:2469
依据 EV-08b51b83b5b59f6cba8aa48e资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ce3ec56fa4a5e1a34bdd4588498f510f93f5e3d6e94452012f327b90ed974dff
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:2293
依据 EV-baf7d48a8130f0ad8167fe19资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5c91fdcf319fafd625691424d6ec2039c53b48eb348d1b5930588d1b11d86ae9