Hecate Energy Cider Solar LLC / 11111
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 557 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-6fa173a418a81a98d9cf32ea |
| Net Summer Capacity (MW) | 557 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-6fa173a418a81a98d9cf32ea |
| Net Winter Capacity (MW) | 557 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-6fa173a418a81a98d9cf32ea |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 60025 |
| Entity Name | Greenbacker Renewable Energy Corporation |
| Plant ID | 64163 |
| Plant Name | Hecate Energy Cider Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Genesee |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | 11111 |
| Nameplate Capacity (MW) | 557 |
| Net Summer Capacity (MW) | 557 |
| Net Winter Capacity (MW) | 557 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.097336 |
| Longitude | -78.23041 |
| 原文の状態 | (U) Under construction, less than or equal to 50 percent complete |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:200 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:417
根拠 EV-1443df49873974ea4a510230資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b1650721bf704c5ab657fee37f1e93734ddbb07093ddb406445d35736c2e85d8
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:200
根拠 EV-6fa173a418a81a98d9cf32ea資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c