Hecate Energy Cider Solar LLC / 11111
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 557 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-6fa173a418a81a98d9cf32ea |
| Net Summer Capacity (MW) | 557 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-6fa173a418a81a98d9cf32ea |
| Net Winter Capacity (MW) | 557 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-6fa173a418a81a98d9cf32ea |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 60025 |
| Entity Name | Greenbacker Renewable Energy Corporation |
| Plant ID | 64163 |
| Plant Name | Hecate Energy Cider Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Genesee |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | 11111 |
| Nameplate Capacity (MW) | 557 |
| Net Summer Capacity (MW) | 557 |
| Net Winter Capacity (MW) | 557 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.097336 |
| Longitude | -78.23041 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:200 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:417
依据 EV-1443df49873974ea4a510230资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b1650721bf704c5ab657fee37f1e93734ddbb07093ddb406445d35736c2e85d8
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:200
依据 EV-6fa173a418a81a98d9cf32ea资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 48ad8d2399cdff879dc84756fa0d3af1f3c7b383285990edb2ba822f5c64e5f8
