Coolidge Generation Station / COE20
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 49.5 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-4488825e9c8248d750ba4297 |
| Net Summer Capacity (MW) | 42 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-4488825e9c8248d750ba4297 |
| Net Winter Capacity (MW) | 48 MW | 原出典の列定義 · 発電機 · (U) Under construction, less than or equal to 50 percent complete 基準日 2026-08 根拠 EV-4488825e9c8248d750ba4297 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 16572 |
| Entity Name | Salt River Project |
| Plant ID | 56948 |
| Plant Name | Coolidge Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Pinal |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | COE20 |
| Nameplate Capacity (MW) | 49.5 |
| Net Summer Capacity (MW) | 42 |
| Net Winter Capacity (MW) | 48 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 32.917399 |
| Longitude | -111.5033 |
| 原文の状態 | (U) Under construction, less than or equal to 50 percent complete |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:909 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:194
根拠 EV-cc1e2ad233d1aa97134f25bc資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5594358b0e03f6475060c5608504ff46789414a71522876bd85c74f619d5fb6c
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:909
根拠 EV-4488825e9c8248d750ba4297資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8cac03b4caacf9b9b9188e358bf5b387db0d52bc0597a9c369ff15369db5d65e