Coolidge Generation Station / COE20
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 49.5 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-4488825e9c8248d750ba4297 |
| Net Summer Capacity (MW) | 42 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-4488825e9c8248d750ba4297 |
| Net Winter Capacity (MW) | 48 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-4488825e9c8248d750ba4297 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 16572 |
| Entity Name | Salt River Project |
| Plant ID | 56948 |
| Plant Name | Coolidge Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Pinal |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | COE20 |
| Nameplate Capacity (MW) | 49.5 |
| Net Summer Capacity (MW) | 42 |
| Net Winter Capacity (MW) | 48 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 32.917399 |
| Longitude | -111.5033 |
| 원문 상태 | (U) Under construction, less than or equal to 50 percent complete |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:909 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:194
근거 EV-cc1e2ad233d1aa97134f25bc자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5594358b0e03f6475060c5608504ff46789414a71522876bd85c74f619d5fb6c
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:909
근거 EV-4488825e9c8248d750ba4297자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8cac03b4caacf9b9b9188e358bf5b387db0d52bc0597a9c369ff15369db5d65e