Boiling Down BESS
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 4 MWac | 原出典の列定義 · 発電登録単位 · Publicly Announced 基準日 2026-07-31 根拠 EV-9b0bf454cf2bde515aa94c6d |
| Aggregated Nameplate Capacity (MW AC) | 260 MWac | 原出典の列定義 · 発電登録単位 · Publicly Announced 基準日 2026-07-31 根拠 EV-9b0bf454cf2bde515aa94c6d |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 2476 |
| Site Name | Boiling Down BESS |
| KCI Id | N00111 |
| Site Owner | Hanwha Energy Australia Pty Ltd |
| Region | NSW1 |
| Max Site Capacity (AC) | 200 |
| Gen Info Unit ID | 247601 |
| Unit Name | BDBS_GU1 |
| Technology Type | Battery Storage |
| Technology Detail | Lithium-ion |
| Dispatch Type | Scheduled |
| Unit Count | 65 |
| Unit Capacity (MW AC) | 4 |
| Aggregated Nameplate Capacity (MW AC) | 260 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2023-04-19T23:16:18 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | Publicly Announced |
| source_record_id | Generator Information:146 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:146
根拠 EV-9b0bf454cf2bde515aa94c6d資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 d65a29cfdcb0dcce8357d0c17ba5a5daaa98bcad9ecd6c35404c0304eb949626
利用条件 AEMO general copyright permission subject to exceptions