KOREA DATA CENTER DATABASE

Find a domestic data center and compare them under the same conditions.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Registered Business Sites99Includes operating and developing sites
Operating centers68Includes operation and expansion plans
Map Display94Address and area-level locations distinguished
Operating and Development Entities29Names linked to public centers

Latest facility record check 2026-10-10 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Centers by operator · 29entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Plan1 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • Dangjin, South Chungcheong Province1 items

Search Results 1Location

Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
Map Display 1sites / results 1Location

Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.

Dangjin, South Chungcheong ProvincePlan

NFD Dangjin Songsan AI Data Center Campus

NFD Korea·EFD

Songsan 2 General Industrial Complex, Dangjin City, South Chungcheong Province (Public Agreement: 35,239 m²; Developer’s Current Project: 43,188 m²; specific lot details not disclosed)

Public Power
Official documents: 100 MW Power System Impact Assessment submitted; operator claims 300 MW supply contract with KEPCO; currently disclosed IT load: 140 MW; original contract text not verified.
Size & facility
Public Agreement: Building C, 100 MW; Operator Campus Announcement: Buildings A, B, and C, total 300 MW; Current project page: IT load 140 MW
운영사·공식자료 확인Facility record checked 2026-09-16

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

Start a consultation · Choose a channel