KOREA DATA CENTER DATABASE

Find a domestic data center and compare them under the same conditions.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Registered Business Sites99Includes operating and developing sites
Operating centers68Includes operation and expansion plans
Map Display94Address and area-level locations distinguished
Operating and Development Entities29Names linked to public centers

Latest facility record check 2026-10-10 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Centers by operator · 29entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Under construction2 items
  • Before construction begins2 items
  • Building permit under review1 items
  • Licensing Complete1 items
  • Permit and Licensing Process1 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • Bucheon, Gyeonggi Province2 items
  • Uijeongbu, Gyeonggi Province1 items
  • Hanam, Gyeonggi Province1 items
  • Gangseo, Busan1 items
  • Guro, Seoul1 items
  • 전남 무안1 items

Search Results 7Location

Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
Map Display 7sites / results 7Location

Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.

전남 무안Building permit under review

Data Center in Block 7, Oryong District, Muan

Project operator not disclosed

Support Block 7, Oryong-ri, Illo-eup, Muan-gun, Jeollanam-do, South Korea

Public Power
Definitions of “200MW-class planned and installed capacity,” “IT load,” and “UPS,” as well as KEPCO’s supply approval, have not been confirmed.
Size & facility
Site area: 37,695.2 m²; total floor area: 85,667 m²; 3 buildings; planned maximum height: 48 m
운영사·공식자료 확인Facility record checked 2026-09-14
Gangseo, BusanPermit and Licensing Process

Data Center in Songjeong-dong, Busan

Operator verification in progress

1711-4 Songjeong-dong, Gangseo-gu, Busan Metropolitan City, and 4 other parcels

Public Power
Undisclosed
Size & facility
Total floor area: 46,107.49 m²
Official Cross-VerificationFacility record checked 2026-08-20
Bucheon, Gyeonggi ProvinceBefore construction begins

Bucheon Naedong Data Center

Operator verification in progress

222-13 Naedong, Ojeong-gu, Bucheon-si, Gyeonggi-do, and 10 other parcels

Public Power
Undisclosed
Size & facility
1 basement level and 4 above-ground floors
Official Cross-VerificationFacility record checked 2026-08-20
Bucheon, Gyeonggi ProvinceUnder construction

Bucheon Samjeong-dong Data Center

Operator verification in progress

13-15 Samjeong-dong, Ojeong-gu, Bucheon-si, Gyeonggi-do

Public Power
Undisclosed
Size & facility
5 basement levels and 7 above-ground levels
Official Cross-VerificationFacility record checked 2026-08-20
Uijeongbu, Gyeonggi ProvinceLicensing Complete

Uijeongbu Yonghyeon-dong Data Center

Operator verification in progress

522-8 Yonghyeon-dong, Uijeongbu-si, Gyeonggi-do

Public Power
Undisclosed
Size & facility
Total floor area: 23,480.78 m²
Official Cross-VerificationFacility record checked 2026-08-20
Hanam, Gyeonggi ProvinceBefore construction begins

Hanam Pungsan-dong Edge Data Center

Operator verification in progress

Pungsan-dong, Hanam-si, Gyeonggi-do

Public Power
Undisclosed
Size & facility
To be cross-checked against the ledger
Official Cross-VerificationFacility record checked 2026-08-20

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

Start a consultation · Choose a channel