KOREA DATA CENTER DATABASE
Find a domestic data center and compare them under the same conditions.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-10 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 29entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.
Digital Edge PUS1
Digital Edge
32 Centum 7-ro, Haeundae-gu, Busan, South Korea
- Public Power
- Official page: 4.5 MW (marked as “planned update”—need to verify current status)
- Size & facility
- Colocation: 9,463 m² · 1,605 cabinets
- 운영사 계획 갱신 용량4.5 MWTarget value · Digital Edge
Digital Edge SEL1
Digital Edge
646-1 Yeoksam-dong, Gangnam-gu, Seoul
- Public Power
- Discrepancy between 4.8 MW on the official page and 2.4 MW in the detailed table
- Size & facility
- 1,055 cabinets · 3,331 m² of colocation space
- 운영사 표기 용량2.4 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL2
Digital Edge
422 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea
- Public Power
- IT capacity: 36 MW
- Size & facility
- Bupyeong Campus Phase 1
- RFS 도달 시 points2024-08 date_monthOperator-disclosed specifications · Digital Edge
- 운영사 표기 용량36 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL3
Digital Edge
Bupyeong-gu, Incheon Metropolitan City (same campus adjacent to SEL2)
- Public Power
- Planned IT capacity: 60 MW
- Size & facility
- Bupyeong Campus Phase 2 and SEL2: Total 96 MW
- 부평 캠퍼스 전체 계획 규모96 MWTarget value · Digital Edge
- 착공 시 points2025-05 date_monthOperator-disclosed specifications · Digital Edge
Digital Edge SEL5
Digital Edge
Siheung National Industrial Complex, Ansan City, Gyeonggi Province (official detailed address not disclosed)
- Public Power
- 90 MVA Power Contract/Plan; IT Load: 60 MW
- Size & facility
- New Physical Site in Ansan
- 신규 센터 계획 규모60 MWTarget value · Digital Edge
- 전력계약 발표 용량90 MVAOperator-disclosed specifications · Digital Edge
Find a center and continue your review.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.