Data Center Database/kt cloud/North Gyeongsang Province
● Operations

KT Cloud Gyeongbuk CDC

North Gyeongsang Province

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Operational

Public PowerUndisclosed

Distinguish between power supply, UPS, and IT load

Facility SizeCurrently verifying the official network of data centers and conducting further research on facility specifications.

Public-Private Partnerships and Cloud

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

국내 최초 민관협력형 데이터센터로 소개되는 경북 디지털 인프라 거점. We confirmed the center name and role on the kt cloud official center network.

01View the official KT Cloud center network
02Reflect the official description of the center’s role
03Addresses, power capacity, and floor space are currently being verified.

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

Although the inclusion in the operational network has been officially confirmed, we are currently cross-checking the detailed road addresses, power capacity, IT load, and number of racks against the original documents and administrative data for each center. Unconfirmed figures are not displayed.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

Start a consultation · Choose a channel