Operational
KT Cloud Daejeon Data Center
Daejeon Metropolitan City
Distinguish between power supply, UPS, and IT load
Regional Hubs and Telecommunications
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
TIA-942 Tier 3~4급 수준을 표방하는 중부권 센터. We confirmed the center name and role on the kt cloud official center network.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
Although the inclusion in the operational network has been officially confirmed, we are currently cross-checking the detailed road addresses, power capacity, IT load, and number of racks against the original documents and administrative data for each center. Unconfirmed figures are not displayed.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
