COMPANY & DATA CENTER DIRECTORY
Jeongdo
企业能力与联系方式
查看韩国数据中心企业名录中Jeongdo的公开依据、服务分类与联系渠道。具体项目服务范围需在委托前核实。
名录服务分类
Data-center mechanical systems and HVAC, OSC smart modules, design/fabrication/construction and performance testing
The September 30, 2026 three-party announcement identifies Jeongdo’s role in data-center mechanical systems and OSC smart-module construction. Korea Mechanical Construction Contractors Association records confirm CEO Lee Woo-hyung, its Songpa headquarters and mechanical/gas construction registration.
保留原始资料及韩语专有名称。部分详细原文仍待翻译,具体服务范围和当前能力需与企业确认。
公开资料详情
Mechanical systems and high-tech specialist construction and engineering · Korean mechanical-systems specialist
Jeongdo
JeongdoData-center mechanical systems and HVAC, OSC smart modules, design/fabrication/construction and performance testing
COMPANY & DATA CENTER BRIEF
公司及主要业务
Jeongdo公开信息中显示的公司类型为 Mechanical systems and high-tech specialist construction and engineering,规模分类为 Korean mechanical-systems specialist。在AI-DC KOREA中, 建筑·CM · 电气设备 · 制冷·机械 · 施工 将其归类为建设候选项目,公开的主要范围为 Data-center mechanical systems and HVAC, OSC smart modules, design/fabrication/construction and performance testing。
The September 30, 2026 three-party announcement identifies Jeongdo’s role in data-center mechanical systems and OSC smart-module construction. Korea Mechanical Construction Contractors Association records confirm CEO Lee Woo-hyung, its Songpa headquarters and mechanical/gas construction registration. 因此,在数据中心业务中, 데이터센터 기계설비·공조 시공 후보 검토, OSC·프리패브 설비 모듈 검토, BIM 기반 제작·현장 설치 인터페이스, TAB·성능점검과 준공 인수 조건 검토 这可能成为工作的优先审查候选项目。不过,“确认国内数据中心业绩“ ”符号表示公开依据的范围,并不代表中标保证或绝对排名。
WHAT THEY DO WELL
优势
- More than 40 years of mechanical construction and engineering experience
- High-tech systems experience in semiconductors, batteries, biotech and data centers
- OSC smart-module and construction capability
- Collaboration on integrating design, fabrication and construction data
BEST-FIT WORK
适用工作
- Review as a data-center mechanical/HVAC construction candidate
- Review OSC and prefabricated systems modules
- BIM-based fabrication and site-installation interface
- Review TAB, performance testing and completion/acceptance conditions
BEFORE APPOINTMENT
发包前确认事项
- Separate the MOU’s general high-tech/data-center experience claim from named projects, contract scope and completed work
- Verify OSC factory-completion share, transport, lifting, site connections and inspection responsibility
- Verify cooling capacity, efficiency, water quality, redundancy and controls in project designs and test reports
- Verify design, fabrication, construction and data responsibility boundaries with Hanshin and ZYX
- Verify recent work, licenses, specialist staff, guarantees and defect-response arrangements
INDEPENDENT SOURCE REVIEW
独立分析
以公开原文为准
3자 데이터센터 스마트건설 협력 발표·대한기계설비건설협회 공개정보 대조은(는) 2026년 9월 30일 3자 협약 발표에서 정도가 데이터센터 기계설비와 OSC 스마트 모듈·시공 역량을 담당하는 것으로 확인했습니다. 대한기계설비건설협회 공개정보는 이우형 대표와 서울 송파구 본사, 기계설비·가스공사업 등록을 확인합니다. 이 자료는 회사의 공개 주장·공식 기록을 확인하는 1차 근거로 사용합니다.
查看原始依据 ↗适用性与局限性
정도은(는) 데이터센터 기계설비·공조, OSC 스마트 모듈, 설계·제작·시공과 성능점검 범위에서 공개된 데이터센터 직접 근거가 확인된 발주 후보로 분류합니다. 실제 선정 전에는 최근 국내 프로젝트, 담당팀, 계약 책임범위와 가용 인력을 다시 확인해야 합니다.
交叉核查结果
공식 공개범위와 AI-DC 분류가 일치하는 부분은 40여 년의 기계설비 시공·엔지니어링 경험, 반도체·배터리·바이오·데이터센터 하이테크 설비 경험, OSC 스마트 모듈·시공 역량, 설계·제작·시공 데이터 통합 협력입니다. 2026.09.30 Hanshin E&C, Jeongdo and ZYX Technology partner on smart data-center construction 자료를 최근 신호로 반영했습니다.
禁止过度解读
请勿将公司及海外市场资料中的服务说明或项目公告,过度解读为当前已获订单、已完成许可审批、已确保电力供应或性能有保障。请另行核对各国内项目地点的官方行政资料与合同范围。
实地考察检查清单
- Separate the MOU’s general high-tech/data-center experience claim from named projects, contract scope and completed work
- Verify OSC factory-completion share, transport, lifting, site connections and inspection responsibility
- Verify cooling capacity, efficiency, water quality, redundancy and controls in project designs and test reports
- Verify design, fabrication, construction and data responsibility boundaries with Hanshin and ZYX
- Verify recent work, licenses, specialist staff, guarantees and defect-response arrangements
公司公告、公示及公共资料仅在可核实范围内引用;关于电力保障、许可完成、当前容量及合同业绩等内容,若无相应原始文件,则保持“未确认”状态。
PUBLIC BUSINESS CONTACT
负责部门·公开联系方式
CONTACT & VERIFICATION