AGS Inverclyde BESS
接続登録 · scoping
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| MW Connected | 0 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-388b5c612621c966a982b9b4 |
| MW Increase / Decrease | 99 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-388b5c612621c966a982b9b4 |
| Cumulative Total Capacity (MW) | 99 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-388b5c612621c966a982b9b4 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Project Name | AGS Inverclyde BESS |
| Customer Name | SLATE ISLAND DEVELOPMENTS LIMITED |
| Connection Site | Braeside IDNO 132/33kV substation |
| Stage | 未取得 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 99.00 |
| Cumulative Total Capacity (MW) | 99.00 |
| MW Effective From | 2031-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000f4OeAAI |
| Project Number | PRO-003840 |
| Gate | 1 |
| 原文の状態 | Scoping |
| source_record_id | csv:row:30 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-10-01 ・取得確認 2026-10-05
Supported by National Energy SO Open Data
原文内の位置 csv:row:30
根拠 EV-388b5c612621c966a982b9b4資料SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ca50530ec752b0f6a802d067e7bba4ea7bab9d2dc17243e8912c57e67e81e6a4