154kV 북다산S/S 건설사업
電力事業 · 工事事業
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · 工事事業 基準日 2026-09 根拠 EV-d12d190964b6d35e15d47046 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| stable_project_id | kproj_816f2dd983a85ac5 |
| stable_project_key | prjtDef:231525:ESB |
| project_definition | 231525 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 북다산S/S 건설사업 |
| project_name_list | 154kV 북다산 변전소 건설사업 |
| purpose | 변전설비 적기확충으로 안정적 전력공급 |
| project_region_detail | 경상북도 고령군 |
| project_period_raw | 2021.10~2026.06 |
| project_scale_raw | 40MVA X 2BANK |
| responsible_office_raw | 남부건설본부/대구경북건설지사 |
| equipment_type | 변전 |
| headquarters | 남부건설본부 |
| office | 대구경북건설지사 |
| current_stage_raw | 공사착수-사업완료전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | 未取得 |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| 原文の状態 | 공사착수-사업완료전 |
| source_record_id | stable_project_id:kproj_816f2dd983a85ac5 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-09 ・取得確認 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
原文内の位置 stable_project_id:kproj_816f2dd983a85ac5
根拠 EV-d12d190964b6d35e15d47046資料SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 21e768a2e6d4e7c203d5045e3b8d2722462a9ff48b47889cc9e4074129a1f634
