Collier BESS
発電施設 · 未確認
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Grid Voltage (kV) | 13.2 kV | 原出典の列定義 · 発電所 · 未確認 基準日 2025 根拠 EV-042051237c173ea32f4fd55b |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Utility ID | 13683 |
| Utility Name | North Carolina El Member Corp |
| Plant Code | 65248 |
| Plant Name | Collier BESS |
| Street Address | 880 Johnson Farm Road |
| City | Fayetteville |
| State | NC |
| Zip | 28311 |
| County | Cumberland |
| Latitude | 35.204903 |
| Longitude | -78.890313 |
| NERC Region | SERC |
| Balancing Authority Code | CPLE |
| Balancing Authority Name | Duke Energy Progress East |
| Name of Water Source | NA |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | RE |
| Sector | 1 |
| Sector Name | Electric Utility |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | N |
| Transmission or Distribution System Owner | South River Elec Member Corp |
| Transmission or Distribution System Owner ID | 17572 |
| Transmission or Distribution System Owner State | NC |
| Grid Voltage (kV) | 13.2 |
| Energy Storage | Y |
| Natural Gas Storage | N |
| Liquefied Natural Gas Storage | N |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:12402 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 1件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 2___Plant_Y2025.xlsx#Plant:12402
根拠 EV-042051237c173ea32f4fd55b資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1ec8127aaeab432f335215725b9be78ae21b4c27b1d885bd741a81423b6c82a4