Astoria Generating Station / 1
発電機 · 運用停止
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 15 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-ce5337552b34010d2f0b0caf |
| Net Summer Capacity (MW) | 15.7 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-ce5337552b34010d2f0b0caf |
| Net Winter Capacity (MW) | 20.5 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-ce5337552b34010d2f0b0caf |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 54863 |
| Entity Name | Astoria Generating Company, L.P. |
| Plant ID | 8906 |
| Plant Name | Astoria Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Queens |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 15 |
| Net Summer Capacity (MW) | 15.7 |
| Net Winter Capacity (MW) | 20.5 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 7 |
| Operating Year | 1967 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 40.787674 |
| Longitude | -73.91256 |
| 原文の状態 | (OS) Out of service and NOT expected to return to service in next calendar year |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:8198 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Operable:8196
根拠 EV-dcc693a1dea616bc3eae052c資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 775e51c8bfe3bd0d6806a6f7a26270b050a49268dc3bd82942597db5ff388a87
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Operating:8198
根拠 EV-ce5337552b34010d2f0b0caf資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f6dc2ab31cf7d7f573a6eef231fce091ce622da2c7c9f63b70958990a1d14134
