Talbot County Energy / 7
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 262 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-820e5e28dd330b04df2afd12 |
| Net Summer Capacity (MW) | 241 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-820e5e28dd330b04df2afd12 |
| Net Winter Capacity (MW) | 256 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-820e5e28dd330b04df2afd12 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 7916 |
| Plant Name | Talbot County Energy |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Talbot |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 7 |
| Nameplate Capacity (MW) | 262 |
| Net Summer Capacity (MW) | 241 |
| Net Winter Capacity (MW) | 256 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 1 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.5892 |
| Longitude | -84.6917 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1839 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:131
根拠 EV-c387b90147ad273e4d7cce5c資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cae4ccfbf36230ed8cf7a0c92d9422eceb69e21f260c420cb306f7ef4ee895b0
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:1839
根拠 EV-820e5e28dd330b04df2afd12資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 058cdadd40f4b26ae982d80aa6afb041ff1493e70f0845456429284387adceb1