Rock Island Generation Project / RIG3
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 20.3 MW | 原出典の列定義 · 発電機 · (L) Regulatory approvals pending. Not under construction 基準日 2026-08 根拠 EV-cbd815fb8d3250c14a8beec4 |
| Net Summer Capacity (MW) | 19.9 MW | 原出典の列定義 · 発電機 · (L) Regulatory approvals pending. Not under construction 基準日 2026-08 根拠 EV-cbd815fb8d3250c14a8beec4 |
| Net Winter Capacity (MW) | 19.9 MW | 原出典の列定義 · 発電機 · (L) Regulatory approvals pending. Not under construction 基準日 2026-08 根拠 EV-cbd815fb8d3250c14a8beec4 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 67625 |
| Entity Name | Kerrville Public Utility Board Public Facility Corp |
| Plant ID | 69760 |
| Plant Name | Rock Island Generation Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Colorado |
| Balancing Authority Code | ERCO |
| Sector | Electric Utility |
| Generator ID | RIG3 |
| Nameplate Capacity (MW) | 20.3 |
| Net Summer Capacity (MW) | 19.9 |
| Net Winter Capacity (MW) | 19.9 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 29.55068 |
| Longitude | -96.53675 |
| 原文の状態 | (L) Regulatory approvals pending. Not under construction |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1034 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:2138
根拠 EV-a5d3d9d99e0cbd1389f7f1c9資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ef5c43855fb821df285608e0b24b933a908bc117e3529c9d726488ca125d5994
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:1034
根拠 EV-cbd815fb8d3250c14a8beec4資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dad4a4ea620d502dc8f484ca6835f9eb21b18ea34a3df5a12d5e8f8fb4238afb
