Liberty Station / L2
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 18.1 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-623db54bc7a997ba31f03b94 |
| Net Summer Capacity (MW) | 17.8 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-623db54bc7a997ba31f03b94 |
| Net Winter Capacity (MW) | 17.8 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-623db54bc7a997ba31f03b94 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 5580 |
| Entity Name | East Kentucky Power Coop, Inc |
| Plant ID | 69726 |
| Plant Name | Liberty Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Casey |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | L2 |
| Nameplate Capacity (MW) | 18.1 |
| Net Summer Capacity (MW) | 17.8 |
| Net Winter Capacity (MW) | 17.8 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.369331 |
| Longitude | -84.95767 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1819 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:2115
根拠 EV-9a39cf4fa8143f515e4dbbab資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1551b502bbee2a3d708e507f1df778004f87d73f7543633fa29df698bd20af53
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:1819
根拠 EV-623db54bc7a997ba31f03b94資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 96f5e26a3a3de6c4cdd3dc5b4a3b8a36f8d795d55aa493e62fbb69d570576e51