Westlake Power Station / CA1
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 341.7 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-69fd86509d1ce27eb69fd2ba |
| Net Summer Capacity (MW) | 341.7 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-69fd86509d1ce27eb69fd2ba |
| Net Winter Capacity (MW) | 299.6 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-69fd86509d1ce27eb69fd2ba |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69426 |
| Plant Name | Westlake Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Calcasieu |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | CA1 |
| Unit Code | WL1 |
| Nameplate Capacity (MW) | 341.7 |
| Net Summer Capacity (MW) | 341.7 |
| Net Winter Capacity (MW) | 299.6 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 10 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.281105 |
| Longitude | -93.30189 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2089 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:1850
根拠 EV-b866dfef87c02418facd6884資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 050105828b725750140a268999fc4dfaeffda35a574870deb7d51d36190a0274
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:2089
根拠 EV-69fd86509d1ce27eb69fd2ba資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6e32f2a19b31a3c151ee0947a80a9d05c876d7f10a983e1bbe6c447823a11caf