Somerset Solar LLC / NYSOM
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 100 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-edba82e4b1125c7bb1b6ed05 |
| Net Summer Capacity (MW) | 125 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-edba82e4b1125c7bb1b6ed05 |
| Net Winter Capacity (MW) | 125 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-edba82e4b1125c7bb1b6ed05 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 64904 |
| Entity Name | AES Clean Energy |
| Plant ID | 67324 |
| Plant Name | Somerset Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Niagara |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | NYSOM |
| Nameplate Capacity (MW) | 100 |
| Net Summer Capacity (MW) | 125 |
| Net Winter Capacity (MW) | 125 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 43.352072 |
| Longitude | -78.61036 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1981 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:824
根拠 EV-91ab96d6864a777b8ec93fab資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 12e71844be9e5f005fe17e20b4ff84b7bbea720ef5a9b41c5fae18472fd2a7d7
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:1981
根拠 EV-edba82e4b1125c7bb1b6ed05資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 905b18e516701d9c294e9045bfb97fb8612cb8a5ffcf3db61b653ca2b164ded3