Emsworth BC Hydroelectric Project / NA2
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 6 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-75ef7e74d0c9378f7063b760 |
| Net Summer Capacity (MW) | 4 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-75ef7e74d0c9378f7063b760 |
| Net Winter Capacity (MW) | 4 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-75ef7e74d0c9378f7063b760 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62434 |
| Plant Name | Emsworth BC Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Allegheny |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | NA2 |
| Nameplate Capacity (MW) | 6 |
| Net Summer Capacity (MW) | 4 |
| Net Winter Capacity (MW) | 4 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 12 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 40.50083 |
| Longitude | -80.10306 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2105 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:333
根拠 EV-7f3d2f7e1ca8f50e33078ac8資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7e3f73aa5407bb5cf3f35c3ea73bb55a4eac1028cf2ea5266703e540292015ea
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:2105
根拠 EV-75ef7e74d0c9378f7063b760資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 39b813cb3807d6770b655feb2cf9b54632886d30a965cc3ff6f3e05de54aabcd