AES ES GILBERT / SRP
発電機 · 運用停止
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 10 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-fe0372592aab960876fc0a19 |
| Net Summer Capacity (MW) | 10 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-fe0372592aab960876fc0a19 |
| Net Winter Capacity (MW) | 10 MW | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-fe0372592aab960876fc0a19 |
| Nameplate Energy Capacity (MWh) | 40 MWh | 原出典の列定義 · 発電機 · (OS) Out of service and NOT expected to return to service in next calendar year 基準日 2026-08 根拠 EV-fe0372592aab960876fc0a19 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 61482 |
| Entity Name | AES ES GILBERT, LLC |
| Plant ID | 61861 |
| Plant Name | AES ES GILBERT |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Maricopa |
| Balancing Authority Code | SRP |
| Sector | IPP Non-CHP |
| Generator ID | SRP |
| Nameplate Capacity (MW) | 10 |
| Net Summer Capacity (MW) | 10 |
| Net Winter Capacity (MW) | 10 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Operating Month | 1 |
| Operating Year | 2019 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Nameplate Energy Capacity (MWh) | 40 |
| Latitude | 33.446804 |
| Longitude | -111.9563 |
| 原文の状態 | (OS) Out of service and NOT expected to return to service in next calendar year |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:20119 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Operable:20115
根拠 EV-2a7e891b4c289ed865e3e093資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 baed9949ca7f9dd62d18ba8aa37af156346e027f2313ab33918f316f76d03828
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Operating:20119
根拠 EV-fe0372592aab960876fc0a19資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 386389b82c6017d784ccf9fa79590e5af8a72122b6d4cb509007078df2181c6a
