Hurricane City Power / 9
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 2 MW | 原出典の列定義 · 発電機 · T 基準日 2025 根拠 EV-65232a9cc6c4f1c85140c2b3 |
| Summer Capacity (MW) | 1.9 MW | 原出典の列定義 · 発電機 · T 基準日 2025 根拠 EV-65232a9cc6c4f1c85140c2b3 |
| Winter Capacity (MW) | 1.9 MW | 原出典の列定義 · 発電機 · T 基準日 2025 根拠 EV-65232a9cc6c4f1c85140c2b3 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Utility ID | 9128 |
| Utility Name | Hurricane City Power - (UT) |
| Plant Code | 57899 |
| Plant Name | Hurricane City Power |
| State | UT |
| County | Washington |
| Generator ID | 9 |
| Technology | Natural Gas Internal Combustion Engine |
| Prime Mover | IC |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | X |
| Nameplate Capacity (MW) | 2 |
| Nameplate Power Factor | 1 |
| Summer Capacity (MW) | 1.9 |
| Winter Capacity (MW) | 1.9 |
| Status | T |
| Effective Month | 5 |
| Effective Year | 2025 |
| Current Month | 5 |
| Current Year | 2028 |
| Associated with Combined Heat and Power System | N |
| Sector Name | Electric Utility |
| Sector | 1 |
| Previously Canceled | N |
| Energy Source 1 | NG |
| Turbines or Hydrokinetic Buoys | 0 |
| Carbon Capture Technology? | N |
| Multiple Fuels? | N |
| Switch Between Oil and Natural Gas? | N |
| Cofire Fuels? | N |
| 原文の状態 | T |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:207 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:207
根拠 EV-65232a9cc6c4f1c85140c2b3資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b43b53568ae8c0dcaf502724f7d4cd0686848114e6b2547d864426cc79e9bd91
