Middletown / 1
発電機 · 廃止
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 69 MW | 原出典の列定義 · 発電機 · RE 基準日 2025 根拠 EV-453bd384c280e8a2a812d8eb |
| Summer Capacity (MW) | 66.3 MW | 原出典の列定義 · 発電機 · RE 基準日 2025 根拠 EV-453bd384c280e8a2a812d8eb |
| Winter Capacity (MW) | 70 MW | 原出典の列定義 · 発電機 · RE 基準日 2025 根拠 EV-453bd384c280e8a2a812d8eb |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Utility ID | 12490 |
| Utility Name | Middletown Power LLC |
| Plant Code | 562 |
| Plant Name | Middletown |
| State | CT |
| County | Middlesex |
| Generator ID | 1 |
| Technology | Petroleum Liquids |
| Prime Mover | ST |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | X |
| Nameplate Capacity (MW) | 69 |
| Summer Capacity (MW) | 66.3 |
| Winter Capacity (MW) | 70 |
| Uprate or Derate Completed During Year | N |
| Status | RE |
| Synchronized to Transmission Grid | X |
| Operating Month | 8 |
| Operating Year | 1954 |
| Retirement Month | 10 |
| Retirement Year | 1998 |
| Associated with Combined Heat and Power System | N |
| Sector Name | IPP Non-CHP |
| Sector | 2 |
| Topping or Bottoming | X |
| Energy Source 1 | RFO |
| Solid Fuel Gasification System? | N |
| Carbon Capture Technology? | N |
| 原文の状態 | RE |
| source_record_id | 3_1_Generator_Y2025.xlsx#Retired and Canceled:272 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Retired and Canceled:272
根拠 EV-453bd384c280e8a2a812d8eb資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 38e31f727b7fb04429f60f2295427cc6d2e0de642630c99d9de293d96777b9a3
