Batesville Generation Facility / CTG3
発電機 · 運営
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 184.5 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-68ba21c65eaf30467d7503c1 |
| Net Summer Capacity (MW) | 176 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-68ba21c65eaf30467d7503c1 |
| Net Winter Capacity (MW) | 184.5 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-68ba21c65eaf30467d7503c1 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 17568 |
| Entity Name | Cooperative Energy |
| Plant ID | 55063 |
| Plant Name | Batesville Generation Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MS |
| County | Panola |
| Balancing Authority Code | TVA |
| Sector | Electric Utility |
| Generator ID | CTG3 |
| Unit Code | CC3 |
| Nameplate Capacity (MW) | 184.5 |
| Net Summer Capacity (MW) | 176 |
| Net Winter Capacity (MW) | 184.5 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 8 |
| Operating Year | 2000 |
| Status | (OP) Operating |
| Latitude | 34.3356 |
| Longitude | -89.9275 |
| 原文の状態 | (OP) Operating |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:11293 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Operable:11293
根拠 EV-7ff4b338742b5874b9e11500資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1d7765f617c03bc670a9084d64da6aa1789d70d316c00edd0c806a880f003d8b
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Operating:11293
根拠 EV-68ba21c65eaf30467d7503c1資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a9ce1b3bffdb3a5b94aa6117770c7e8d9eee4680b6a74b356302d0894998cfb7