Goodwin Hydroelectric / G1
発電機 · 運用停止
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 1.6 MW | 原出典の列定義 · 発電機 · (OA) Out of service but expected to return to service in next calendar year 基準日 2026-08 根拠 EV-62d949fc91861d6c1e52fad7 |
| Net Summer Capacity (MW) | 1.5 MW | 原出典の列定義 · 発電機 · (OA) Out of service but expected to return to service in next calendar year 基準日 2026-08 根拠 EV-62d949fc91861d6c1e52fad7 |
| Net Winter Capacity (MW) | 1.5 MW | 原出典の列定義 · 発電機 · (OA) Out of service but expected to return to service in next calendar year 基準日 2026-08 根拠 EV-62d949fc91861d6c1e52fad7 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 12382 |
| Entity Name | Metropolitan Dist of Hartford |
| Plant ID | 54302 |
| Plant Name | Goodwin Hydroelectric |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CT |
| County | Hartford |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | G1 |
| Nameplate Capacity (MW) | 1.6 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 4 |
| Operating Year | 1986 |
| Status | (OA) Out of service but expected to return to service in next calendar year |
| Latitude | 41.988611 |
| Longitude | -73.0194 |
| 原文の状態 | (OA) Out of service but expected to return to service in next calendar year |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:10378 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Operable:10375
根拠 EV-64aa56e022eec19ff663f39e資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2a8c7666d7c5d53799fefa25a8df63198850c3f58bc530cb5926069cc05e4467
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Operating:10378
根拠 EV-62d949fc91861d6c1e52fad7資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 52df6e46861c664b586c934f85a1b45331736f80c5e2e1f7630c1cbadf7dcb5f