Bellingham Cogeneration Facility / ST1
発電機 · 運営
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 128.7 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-b81997863bcf7c2f38c44ac4 |
| Net Summer Capacity (MW) | 60 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-b81997863bcf7c2f38c44ac4 |
| Net Winter Capacity (MW) | 84 MW | 原出典の列定義 · 発電機 · (OP) Operating 基準日 2026-08 根拠 EV-b81997863bcf7c2f38c44ac4 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 21970 |
| Entity Name | Northeast Energy Associates LP |
| Plant ID | 10307 |
| Plant Name | Bellingham Cogeneration Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MA |
| County | Norfolk |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | ST1 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 128.7 |
| Net Summer Capacity (MW) | 60 |
| Net Winter Capacity (MW) | 84 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Operating Month | 9 |
| Operating Year | 1991 |
| Status | (OP) Operating |
| Latitude | 42.0925 |
| Longitude | -71.4833 |
| 原文の状態 | (OP) Operating |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:8482 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Operable:8480
根拠 EV-a7f5b2acedfdb6f3ff37c5f5資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e2ea51fb0c4c1379283f807576bde96ade175a04d8a44d91e1e5710e94e57701
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Operating:8482
根拠 EV-b81997863bcf7c2f38c44ac4資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e70bb5c6f2144d9d59e110e20599737e83602383dfd70bbf46ff993e63c22adb