Brown Mountain Hydro Power Station
発電機 · 運営
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 5 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-7848c705eec3fd657788aa6d |
| Aggregated Nameplate Capacity (MW AC) | 5 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-7848c705eec3fd657788aa6d |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 2076 |
| Site Name | Brown Mountain Hydro Power Station |
| Site Owner | Cochrane Dam Pty Ltd |
| Region | NSW1 |
| Max Site Capacity (AC) | 5 |
| Gen Info Unit ID | 207601 |
| Unit Name | Brown Mo |
| Technology Type | Hydro |
| Technology Detail | Dam |
| DUID | BROWNMT |
| Dispatch Type | Non-scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 5 |
| Aggregated Nameplate Capacity (MW AC) | 5 |
| Commitment Status | In Service |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2022-09-26T21:26:57 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | In Service |
| source_record_id | Generator Information:202 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:202
根拠 EV-7848c705eec3fd657788aa6d資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 4ba402427a817038efe99843b81e83aee7bd43c67fd4a2c6fc9c87acb0a42b08
利用条件 AEMO general copyright permission subject to exceptions
