금양 기장공장 전환 AI 데이터센터
부산광역시 기장군 장안읍 오리 동부산 E-PARK 일반산업단지(정확한 필지 확인 필요)
- Public Power
- 154kV 변전소·100MW급 변압기 3대 이전 계획·DC 수전용량/IT Load/UPS/PUE 미확인
- Size & facility
- 기장공장 토지·건축물과 전력·냉각·용수·공조·통신·보안 기반시설 전환 계획
KOREA DATA CENTER DATABASE
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-31 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Official specification evidence 106records · latest check 2026-11-02. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.
부산광역시 기장군 장안읍 오리 동부산 E-PARK 일반산업단지(정확한 필지 확인 필요)
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.