KOREA DATA CENTER DATABASE

Explore Korean data center locations and status.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Latest facility record check 2026-10-31 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Official specification evidence 106records · latest check 2026-11-02. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Search Results 142Location · 1–24 shown

Map Display 137sites / results 142Location

Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.

VWorld 지도 영상을 불러오고 있습니다.
Operational NotationOther project phasesArea reference — not facility location
Geumcheon, Seoul · Koramco Asset ManagementUnder construction

Gasan K-Square Data Center

319-19 Gasan-dong, Geumcheon-gu, Seoul

Public Power
Undisclosed
Size & facility
대지 6,141㎡·연면적 41,214.54㎡·지하 3층/지상 11층
Address-based location · Facility record reviewed 2026-10-19
Guro, Seoul · Operator verification in progressUnder construction

New Construction of the Gaebong-dong Data Center

166-2 Gaebong-dong, Guro-gu, Seoul

Public Power
Undisclosed
Size & facility
CM사 공개 연면적 19,255.39㎡·지하 4층/지상 8층(기존 행정원장 20,665㎡ 별도)
Address-based location · Facility record reviewed 2026-10-19
Incheon Metropolitan City · 교보DTSOperations

교보 송도 데이터센터

인천광역시 연수구 벤처로14

Public Power
수전·시설전력: power_input: 10000 kW (송도 교보데이터센터)
Size & facility
연면적·건물: 10985 ㎡ (송도 교보데이터센터)
Address-based location · Facility record reviewed 2026-10-29
North Chungcheong Province · Korea Meteorological AdministrationOperations

국가기상슈퍼컴퓨터센터

충청북도 청주시 청원구 오창읍 중심상업2로72

Public Power
수전·시설전력: power_input: 14000 kW (국가기상슈퍼컴퓨터센터 공개 설비표) · IT Load: 5호기 소비전력6,354kW (시설 정격 IT Load와 구분) · UPS: ups_capacity: 13500 kVA (국가기상슈퍼컴퓨터센터 공개 설비표) · 비상발전: backup_power: 10750 kW (국가기상슈퍼컴퓨터센터 공개 설비표)
Size & facility
대지: 23,092㎡ · 연면적·건물: 8,465.8㎡ · 전산실·코로케이션: 5호기 상면780㎡ (센터 전체 상면 아님)
Address-based location · Facility record reviewed 2026-10-29
Gwangju Metropolitan City · 행정안전부 NIRSOperations

국가정보자원관리원 광주센터

광주광역시 서구 송암로143번길34

Public Power
공개 전력 미확보
Size & facility
연면적·건물: 34,000㎡
Address-based location · Facility record reviewed 2026-10-29
Daegu Metropolitan City · 행정안전부 NIRSOperations

국가정보자원관리원 대구센터

대구광역시 동구 도장길55-25

Public Power
공개 전력 미확보
Size & facility
대지: 80,548㎡ · 연면적·건물: 35,675㎡
Address-based location · Facility record reviewed 2026-10-29
Daejeon Metropolitan City · 행정안전부 NIRSOperations

국가정보자원관리원 대전본원

대전광역시 유성구 대덕대로755

Public Power
공개 전력 미확보
Size & facility
연면적·건물: 61,880㎡
Address-based location · Facility record reviewed 2026-10-29
Busan Area · 금양·케이와이디씨(KYDC, 분할신설 예정)Plan

금양 기장공장 전환 AI 데이터센터

부산광역시 기장군 장안읍 오리 동부산 E-PARK 일반산업단지(정확한 필지 확인 필요)

Public Power
154kV 변전소·100MW급 변압기 3대 이전 계획·DC 수전용량/IT Load/UPS/PUE 미확인
Size & facility
기장공장 토지·건축물과 전력·냉각·용수·공조·통신·보안 기반시설 전환 계획
Area reference — not facility location · Facility record reviewed 2026-10-20
Jiphyeon-dong, Sejong · NaverOperations

Naver Data Center Gak, Sejong

824 Haengbok-daero, Sejong, South Korea

Public Power
수전·시설전력: 최대 수전용량 270MW 설계
Size & facility
대지: 9만평 부지(운영사 원문 단위)
  • Cooling technologyNAMU3 직접 외기·간접 외기 선택 하이브리드 공조Operator-disclosed specifications
  • 본격 가동 시 pointsFull-scale operation begins in November 2023Operator-disclosed specifications
Address-based location · Facility record reviewed 2026-10-29Specification evidence 4records · checked 2026-10-19
Chuncheon, Gangwon Province · NaverOperations

Naver Data Center Gak, Chuncheon

강원특별자치도 춘천시 순환대로 1231

Public Power
수전·시설전력: 각 세종의 1/6.75 수준으로 공식 비교·절대값 별도 확인
Size & facility
연면적·건물: 연면적 약 46,850㎡
Area reference — not facility location · Facility record reviewed 2026-10-29
Seoul Special City · 다우기술Operations

다우 마포 IDC

서울특별시 마포구 독막로311 재화스퀘어

Public Power
UPS: N+1 UPS
Size & facility
공개 규모 미확보
Address-based location · Facility record reviewed 2026-10-29
Seoul Special City · 다우기술Operations

다우 보라매 IDC

서울특별시 동작구 보라매로5길35 보라매파크스퀘어

Public Power
UPS: N+1 UPS
Size & facility
공개 규모 미확보
Address-based location · Facility record reviewed 2026-10-29
Gangwon Special Self-Governing Province · 더존비즈온Operations

더존 D-Cloud 센터

강원특별자치도 춘천시 남산면 버들1길130 (수동리749)

Public Power
UPS: UPS·배터리 이중화
Size & facility
전산실·코로케이션: 지하1층3,300㎡
Address-based location · Facility record reviewed 2026-10-29
Daejeon Metropolitan City · Lotte InnovateOperations

롯데이노베이트 대전2 데이터센터

대전광역시 유성구 가정북로145

Public Power
수전·시설전력: 4,000kW · 비상발전: 5,000kW·72시간
Size & facility
연면적·건물: 4,038㎡
Address-based location · Facility record reviewed 2026-10-29
Seoul Special City · Lotte InnovateOperations

롯데이노베이트 서울1 데이터센터

서울특별시 금천구 가산동 (상세번지 미확정)

Public Power
수전·시설전력: 9,250kW · 비상발전: 6,000kW·자가발전70시간
Size & facility
연면적·건물: 7,411㎡
Area reference — not facility location · Facility record reviewed 2026-10-29
Gyeonggi Province · Lotte InnovateOperations

롯데이노베이트 용인3 데이터센터

경기도 용인시 기흥구 마북로240번길17-9

Public Power
수전·시설전력: 주선로20,000kW·예비선로20,000kW(합산 금지) · 비상발전: 39,120kW·48시간
Size & facility
공개 규모 미확보
Address-based location · Facility record reviewed 2026-10-29
Gyeonggi Province · Lotte InnovateOperations

롯데이노베이트 용인4 데이터센터

경기도 용인시 기흥구 마북동 (3센터 인접, 상세번지 미확정)

Public Power
수전·시설전력: 주선로20,000kW·예비선로20,000kW(합산 금지) · 비상발전: 19,500kW·자가발전36시간
Size & facility
연면적·건물: 16,352㎡
Area reference — not facility location · Facility record reviewed 2026-10-29
전남 무안 · Project operator not disclosedBuilding permit under review

Data Center in Block 7, Oryong District, Muan

Support Block 7, Oryong-ri, Illo-eup, Muan-gun, Jeollanam-do, South Korea

Public Power
Definitions of “200MW-class planned and installed capacity,” “IT load,” and “UPS,” as well as KEPCO’s supply approval, have not been confirmed.
Size & facility
Site area: 37,695.2 m²; total floor area: 85,667 m²; 3 buildings; planned maximum height: 48 m
Area reference — not facility location · Facility record reviewed 2026-10-19
Gangseo, Busan · Operator verification in progressPermit and Licensing Process

Data Center in Songjeong-dong, Busan

1711-4 Songjeong-dong, Gangseo-gu, Busan Metropolitan City, and 4 other parcels

Public Power
Undisclosed
Size & facility
연면적 46,107.49㎡·지상 13층(옥탑층 포함)
Address-based location · Facility record reviewed 2026-10-19
Gangseo, Busan · Busan Metropolitan City공사 완료·운영 범위 확인 중

Busan Healthcare Big Data Center

부산광역시 강서구 에코델타대로95번길 20 (명지동 3728-1)

Public Power
Undisclosed
Size & facility
준공 건설원장: 대지 5,220㎡·연면적 3,157.99㎡·1개 동/지상 3층
Address-based location · Facility record reviewed 2026-10-19
Bucheon, Gyeonggi Province · Operator verification in progressBefore construction begins

Bucheon Naedong Data Center

222-13 Naedong, Ojeong-gu, Bucheon-si, Gyeonggi-do, and 10 other parcels

Public Power
Undisclosed
Size & facility
1 basement level and 4 above-ground floors
Address-based location · Facility record reviewed 2026-10-19
Bucheon, Gyeonggi Province · Operator verification in progressUnder construction

Bucheon Samjeong-dong Data Center

13-15 Samjeong-dong, Ojeong-gu, Bucheon-si, Gyeonggi-do

Public Power
Undisclosed
Size & facility
5 basement levels and 7 above-ground levels
Address-based location · Facility record reviewed 2026-10-19
Gyeonggi Province · line KDB산업은Operations

산업은행 하남 IT센터

경기도 하남시 미사강변한강로177

Public Power
공개 전력 미확보
Size & facility
공개 규모 미확보
Address-based location · Facility record reviewed 2026-10-29
Gangnam, Seoul · 사업주체·운영사 미공개·서한(시공)Plan

삼성역 에지 AI 데이터센터

서울특별시 강남구 대치동 일대(정확한 필지 확인 필요)

Public Power
계획: 수전용량 9MW·IT Load/UPS/PUE 미공 items
Size & facility
대지 1,192㎡·연면적 4,949㎡·지하 5층/지상 4층·1개동 계획
Area reference — not facility location · Facility record reviewed 2026-10-19
Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
Saved searches, database coverage and data tools
Registered centers and services142Operating services in the same building are counted separately
Operating centers and services107Includes operation and expansion plans
Map Display137Address and area-level locations distinguished
Operating and Development Entities58Names linked to public centers

Looking for a center that meets your needs?

Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.

You can submit an initial inquiry without signing up.

Saved regions and filters

Save up to 20 region, operator and project-stage filters to revisit current listings.

Loading saved filters…

Reopen current listings with saved filters. No email alerts are sent.

Centers by operator · 58entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Operations107 items
  • Plan12 items
  • Under construction12 items
  • Checking status2 items
  • Licensing Complete2 items
  • Other7 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • Gyeonggi Province12 items
  • Seoul Special City10 items
  • Busan Area8 items
  • Geumcheon, Seoul7 items
  • Goyang, Gyeonggi Province6 items
  • Other99 items

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel