Balnacraig Battery Storage
接入登记 · consented
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-8a219b9ae4b8164b0d99f34b |
| MW Increase / Decrease | 49.9 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-8a219b9ae4b8164b0d99f34b |
| Cumulative Total Capacity (MW) | 49.9 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-8a219b9ae4b8164b0d99f34b |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Balnacraig Battery Storage |
| Customer Name | BALNACRAIG BATTERY STORAGE LIMITED |
| Connection Site | Alness 132/33kV Substation |
| Stage | 未获取 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 49.90 |
| Cumulative Total Capacity (MW) | 49.90 |
| MW Effective From | 2026-08-31 |
| Project Status | Consents Approved |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005iWnQAI |
| Project Number | PRO-002244 |
| Gate | 2 |
| 原文状态 | Consents Approved |
| source_record_id | csv:row:42 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:42
依据 EV-8a219b9ae4b8164b0d99f34b资料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 0e59d3147bce6e102c9098fd035f94a176fb065e145d80eaccb32df31d41d866
